Plant-floor ERP that cut order-to-dispatch by half

Four plants moved off spreadsheets onto one production, inventory and costing platform with live shop-floor capture.

Client

Meridian Auto Components · Pune

Industry

Automotive manufacturing

Timeline

11 weeks to first release

Team

6 (PM, 2 backend, 2 frontend, QA)

Meridian Auto Components · Pune — Plant-floor ERP that cut order-to-dispatch by half

Overview

The first call was short. Their director said, 'I can tell you last month's cost per part, but not today's.' Meridian presses components for three OEMs out of four plants near Chakan. Planning ran on eleven spreadsheets that one person in the Pune office maintained, dispatch got confirmed over phone calls, and month-end costing swallowed nine working days. Nobody was careless — the volume had simply outgrown the way the place was run.

The challenge

  • Stock figures for the same part differed by as much as 18% between the plant register and the office sheet.
  • Job cards were written by hand on the shift and keyed in the next day, so planning always ran a day behind reality.
  • Costing was retrospective — a loss-making SKU could run for two quarters before anyone noticed.
  • OEM schedules changed most Mondays and re-sequencing production meant a supervisor with a pencil.

How we approached it

01

Two weeks on the floor before a line of code

Our PM and one engineer sat through all three shifts, including the 2 a.m. changeover. We drew the actual process on brown paper with the plant heads and argued about it until it matched what really happens, not what the SOP says.

02

Capture at the machine, not at a desk

Each cell got a tablet in a rubber case. Production, rejection and downtime are four taps. We tested the screens with operators who had never used a smartphone keyboard, and cut every field they hesitated on.

03

Planning that follows the OEM, not the other way round

Delivery schedules pull in from the OEM portals overnight, re-sequence the plan and flag material shortages before the first shift walks in. The planner still approves — the system just stops him starting from zero.

04

Costing that closes every morning

Material, labour and machine-hour rates roll up per job as it happens, so margin per part is on screen at 8 a.m. the next day instead of on the 9th of next month.

What we built

Multi-plant production planning and re-sequencing
Shop-floor job card capture with downtime reasons
Real-time inventory with bin-level traceability
Job-wise costing and margin dashboards
OEM schedule import and dispatch confirmation
Role-based approvals with a full audit trail

Technology stack

Frontend

  • React
  • TypeScript
  • Tailwind CSS

Backend

  • Node.js
  • PostgreSQL
  • Redis

Infrastructure

  • AWS
  • Docker
  • GitHub Actions

The results

51%

faster order-to-dispatch

9 days → 1

month-end costing close

99.2%

inventory accuracy

₹1.4 Cr

annual wastage recovered

"Two of your people stood on my shop floor at two in the morning. That is why the software fits the way we actually work. We stopped guessing and started planning."
Rakesh DeshmukhDirector of Operations, Meridian Auto Components