Industry · Manufacturing

Manufacturing software that ends the WhatsApp-and-Excel plant floor

ERP, MES, dispatch and procurement built for real plants — multi-unit, multi-shift, offline-tolerant, and connected to the Tally or SAP you already run.

9
plants running live
62%
faster order-to-ship
17+
years in delivery

Built for Plant Head · Operations Director · CIO / IT Head · Promoter / MD

1. What you need

2. Scope & timeline

3. Where to send it

What do you want built or fixed?

Takes 40 seconds · Reply within one business hour

Teams in manufacturing and beyond work with us

Tata logo
Reliance logo
Infosys logo
Mahindra logo
Airtel logo
HDFC Bank logo
Zomato logo
Asian Paints logo
Microsoft logo
Amazon logo
Siemens logo
Unilever logo
Emirates logo
Autodesk logo
Kia logo
Shopify logo
Tata logo
Reliance logo
Infosys logo
Mahindra logo
Airtel logo
HDFC Bank logo
Zomato logo
Asian Paints logo
Microsoft logo
Amazon logo
Siemens logo
Unilever logo
Emirates logo
Autodesk logo
Kia logo
Shopify logo

Where it breaks today

The four problems every manufacturing leader describes to us

Before we propose anything, we check which of these are actually costing you money. Usually it is two of the four — and they are not the ones you expect.

016–9 hrs/week lost per manager

Dispatch lives in a WhatsApp group

Three supervisors, four Excel files, and nobody can answer what shipped yesterday without calling somebody.

023–7% margin leak

WIP is a guess until month end

Work in progress is reconciled after the fact, so machine downtime and rework only surface once the cost is already booked.

031 FTE burnt on follow-ups

Procurement chases itself

PO follow-ups, GRN mismatches and vendor reminders eat a full-time person who should be negotiating instead.

04Weeks of reconciliation

Tally and the plant disagree

Finance closes on one number, the floor operates on another, and the audit finds both.

What we build for Manufacturing

Four systems, delivered in the order that pays you back fastest

Scope my build

Plant-floor ERP & MES

Live WIP, job cards, machine downtime and shift output on screens the floor actually uses.

  • Job card and route tracking
  • Downtime and OEE capture
  • Offline-tolerant shop terminals

Order-to-dispatch control

One thread from sales order to gate pass, with e-way bills and PODs generated automatically.

  • Dispatch planning board
  • E-way bill and PODs
  • Customer status updates

AI procurement agent

Vendor follow-ups, quote comparison and three-way invoice matching handled without a human inbox.

  • Automated PO chasing
  • Quote comparison sheets
  • Exception-only AP review

Promoter dashboard

Plant, order book, margin and cash in one screen on the phone — refreshed hourly, not monthly.

  • Unit-wise P&L view
  • Order book and backlog
  • Alerting on thresholds

Measured outcomes

Numbers from live manufacturing deployments

62%

faster order-to-ship

Meridian, 3 units, 14 weeks in

-38%

unplanned downtime

After OEE capture and alerting

99.2%

dispatch data accuracy

Against physical gate audit

Systems we integrate with

SAP B1Tally PrimeZohoSiemens PLCAzure IoTPower BI

Compliance & controls

ISO 27001 practicesGST & e-way billRole-based accessOn-prem option

Your first 90 days

A sequence you can take to your board

  1. Week 1

    1. Plant walkthrough

    We stand on your floor, map the real process and record where paper wins.

  2. Week 2–6

    2. Pilot unit

    One plant, one line live on real data with your supervisors in the room.

  3. Week 7–14

    3. Rollout

    Remaining units, integrations to Tally or SAP, and shift-level training.

  4. Ongoing

    4. Optimise

    AI layers on procurement and quality once the base data is trustworthy.

Manufacturing plant operations dashboard showing production and dispatch data

Case study

Meridian Manufacturing · 3 units, Pune & Aurangabad

Challenge — Dispatch commitments were made from memory. Sales promised dates the plant could not see, and the promoter got the truth only at month close.

What we built — A plant-floor ERP with live WIP, a dispatch control board, e-way bill automation and an AI procurement agent, integrated with their existing Tally Prime.

62%

faster order-to-ship

-38%

unplanned downtime

₹1.4 Cr

working capital released

The first week, my plant head stopped calling me at 9 PM for dispatch numbers. That is when I knew it worked.
Rakesh Iyer · Director, Meridian Manufacturing
See more case studies
They understood a shop floor before they wrote a line of code. Rare.
Anita Deshmukh · CIO, industrial group
Our auditors got the trail they wanted in one export. That never used to happen.
Vikram Shah · Finance Head, auto components

Buyer questions

What manufacturing teams ask before signing

Get a manufacturing roadmap with costs, sequence and payback

No slide deck sales pitch. A senior consultant, your process, and a written plan within three working days.